Fire Flow Improvement Program 5th Ave Pipeline Replacement Project - Contract No. 1931

This contract is for furnishing labor and equipment for the installation of 3,990 linear feet of 18-inch, 14-inch, 12-inch, 10-inch, 8-inch, 6-inch and 4-inch welded steel pipe and cured-in-place-pipe with valves, fittings, pipeline disinfection and appurtenances.
  Addendum 1 (click to expand/collapse)
Name Size
F18003 Addendum No. 1 5.1 MB
  Addendum 2 (click to expand/collapse)
Name Size
F18003 Addendum No. 2 1.1 MB