Contract No. 1928 - Southern Marin Pipeline Replacement Project

The Contractor shall furnish all labor, materials, tools, and equipment, except as otherwise expressly specified, are necessary or proper for completion of the work according to the contract. Work shall be performed and materials provided to the satisfaction of the district.
  Addendum 1 (click to expand/collapse)
Name Size
CN 1928 Addendum 1 523.4 KB
  Addendum 2 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
D20022 Addendum 2 Plans Signed 14.4 MB
D20022 Addendum No. 2 1.0 MB