Fire Flow Improvement Program 5th Ave Pipeline Replacement Project - Contract No. 1931
Marin Municipal Water District
County of Marin
This contract is for furnishing labor and equipment for the installation of 3,990 linear feet of 18-inch, 14-inch, 12-inch, 10-inch, 8-inch, 6-inch and 4-inch welded steel pipe and cured-in-place-pipe with valves, fittings, pipeline disinfection and appurtenances.
Bidding Closed
7/30/20 10:00 am
Piedmont Rd. Pipeline Replacement Project
Marin Municipal Water District
City of Larkspur within the County of Marin, California.
This contract is for furnishing labor and equipment for the installation of 2,190 feet of 6-inch and 4-inch welded steel pipe and 2-inchcopper pipe with valves, fittings, pipe disinfection and appurtenances.
Bidding Closed
7/24/20 5:00 pm
RFP-Lagunitas Creek Watershed Enhancement Plan
Marin Municipal Water District
Marin County
The Marin Municipal Water District (District) is seeking a qualified consultant team to conduct a planning and preliminary design project for salmonid habitat enhancement along Lagunitas Creek and its tributaries in Marin County, California
Bidding Closed
6/10/20 2:00 pm
RFP Pedestrian Bridge Design Services for Azalea Hill Trail Restoration Project
Marin Municipal Water District
The Marin Municipal Water District (District) invites your firm to submit a proposal to provide bridge design services for the Azalea Hill Trail Restoration Project. The District manages 22,500 acres of watershed lands and maintains water infrastructure facilities that deliver drinking water to 190,000 customers
Bidding Closed
5/8/20 4:00 pm
RFP - Geotech Services for Azalea Hill Trail Restoration Project
Marin Municipal Water District
The Marin Municipal Water District (District) invites your firm to submit a proposal to provide geotechnical services for the Azalea Hill Trail Restoration Project. The District manages 22,500 acres of watershed lands and maintains water infrastructure facilities that deliver drinking water to 190,000 customers. The Azalea Hill Trail Restoration Project will install up to seven pedestrian bridges and a retaining wall to improve an existing 2-mile bicycle, equestrian, and hiking route between Bullfrog Quarry and Bolinas Fairfax Road.
Bidding Closed
4/23/20 10:00 am
Administration Building and Corporation Yard Sewer Lateral Replacement Project
Marin Municipal Water District
Town of Corte Madera within in the County of Marin, California
The work to be done includes, but is not limited to the following: installation of a new upper sewer lateral, approximately 175 feet, for 220 Nellen Avenue and installation of a new upper sewer lateral, approximately 600 feet, for 220 Tamal Vista Boulevard with cleanouts, valves, fittings and appurtenances.
Bidding Closed
4/7/20 10:00 am
Ross Reservoir Slide Repair Project
Marin Municipal Water District
County of Marin, California
This contract is for furnishing labor, equipment and materials for landslide earthwork, earth buttress with geogrids, sub‐surface drainage pipes, catch basins, access road earthwork, grading, construction site surveying, installation of approximately 170 feet of 24 inch, 12 inch welded steel pipe with fittings and appurtenances, concrete culvert replacement, access road improvements and site specific erosion control BMP’s. The work to be done is located on MMWD Watershed within the County of Marin, California.
Bidding Closed
2/25/20 10:00 am
Andersen Drive Rectifier Anode Replacement Project
Marin Municipal Water District
County of Marin, California
This contract is for furnishing labor and equipment for the destruction of one existing 10-inch diameter, 150-foot deep cathodic protection well and construction of a new 10-inch diameter, 150-foot deep cathodic protection well. The work to be done is located in the City of San Rafael within the County of Marin, California.
Bidding Closed
2/27/20 2:00 pm
Water System Master Plan RFQ
Marin Municipal Water District
Marin Municipal Water District (MMWD/district) is requesting statement of qualifications (SOQs) from firms interested in providing professional engineering services for development of the Water System Master Plan project. The district will be utilizing a two-step procurement approach— qualified firms are invited to submit a statement of qualifications (SOQ), and if short-listed, will be invited to submit a full proposal on the master plan project.
Bidding Closed
2/13/20 10:00 am
Mesa Vista Tank Pipeline Replacement Project
Marin Municipal Water District
This contract is for furnishing labor, material and equipment for the installation of 8-inch high density polyethylene (HDPE) SDR-11 pipe via directional drilling method for approximately 430 feet; 160 feet of 6-inch welded steel pipe installed via open trench method with all required valves, fittings and appurtenances.