Contract No. 1928 - Southern Marin Pipeline Replacement Project

This contract is for furnishing labor and equipment for the installation of 4,040 feet of 8-inch, 6-inch and 4-inch welded steel pipe and 1,010 feet of 10" HDPE pipe with valves, fittings, pipe disinfection and appurtenances.
  Addendum 1 (click to expand/collapse)
Name Size
D20022 Addendum No. 1 273.6 KB
  Addendum 2 (click to expand/collapse)
Name Size
D20022 Addendum No. 2 244.7 KB
  Bid Results (click to expand/collapse)
Name Size
CN 1928 Preliminary Bids 66.4 KB
  Detailed Bid Tab (click to expand/collapse)
Name Size
D20022 Detailed Bid Tab 100.4 KB