Contract No. 1928 - Southern Marin Pipeline Replacement Project

This contract is for furnishing labor and equipment for the installation of 4,040 feet of 8-inch, 6-inch and 4-inch welded steel pipe and 1,010 feet of 10" HDPE pipe with valves, fittings, pipe disinfection and appurtenances.
  Plans (click to expand/collapse)
Name Size
CN - 1928 Drawing Set 2.7 MB