Southern Marin Pipeline Replacement Project
The work to be done includes, but is not limited to, the following: installation of approximately 120 feet of 10" high density polyethylene (HDPE) pipe by directional drill method, 310 feet of 8-inch welded steel pipe and 100 feet of 1/4" thick welded steel casing with valves, fittings, pipeline disinfection and appurtenances.
Plan Holders
Date | Company | Contact |
10/1/21 11:02 am |
D & D Pipelines Inc
706 San Anselmo Avenue, Suite 146 San Anselmo, CA 94960 |
Dennis McElligott
Tel: 4154826510
|
9/28/21 12:51 pm |
KJ Woods
88 N Hill Drive Brisbane, CA 94005 |
Cristina Bernal
Tel: (415) 759-0506
|
9/21/21 10:12 am |
Maggiora & Ghilotti
555 DuBois St San Rafael, CA 94901 |
Juan Trejo
Tel: 4154598640
|
9/22/21 1:19 pm |
Michael Paul Company, Inc.
1200 Casa Grande Road Petaluma, CA 94954 |
Julia Maher
Tel: 7077691006
Fax: 1200 Casa Grande Road
|
9/22/21 8:06 am |
Piazza Construction
9995 Woodward Ct Penngrove, CA 94951 |
James Piazza
Tel: 707-484-1614
|
9/21/21 3:03 pm |
Terracon Constructors, Inc.
150 Alexander Valley Road Healdsburg, CA 95448 |
Steve Lydon
Tel: 7074330323
Fax: (707) 433-0322
|
9/22/21 8:55 am |
W. R. Forde Associates, Inc.
984 Hensley Street Richmond, CA 94801 |
David Voorhis
Tel: 5102159338
Fax: 5102159867
|