Southern Marin Pipeline Replacement Project

The work to be done includes, but is not limited to, the following: installation of approximately 120 feet of 10" high density polyethylene (HDPE) pipe by directional drill method, 310 feet of 8-inch welded steel pipe and 100 feet of 1/4" thick welded steel casing with valves, fittings, pipeline disinfection and appurtenances.