Fire Flow Improvement Program Ridge Road Pipeline Replacement Project

Installation of approximately 4,660 linear feet of 8-inch, 180 linear feet of 6-inch welded steel pipe, 470 linear feet of 10-inch HDPE pipe with 8-inch, 6-inch, & 4-inch valves, fittings, pipeline disinfection and appurtenances
Addendum 1 (click to expand/collapse)
Name Size
F21002 Addendum No. 1 781.7 KB