Mesa Vista Tank Pipeline Replacement Project

This contract is for furnishing labor, material and equipment for the installation of 8-inch high density polyethylene (HDPE) SDR-11 pipe via directional drilling method for approximately 430 feet; 160 feet of 6-inch welded steel pipe installed via open trench method with all required valves, fittings and appurtenances.