CN 2008 - Bon Tempe Treatment Plant - Backwash Valve Replacement Project
Description: This contract is for furnishing labor, materials, and equipment for the installation of 24-inch and 8-inch welded steel pipe, 8-inch valve, 24-inch butterfly valves, with fittings, pipe disinfection, below grade vault, installation of associated electrical components, and appurtenances.
Addendum 1
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | |||
| Addendum No. 1-D23008- BTTP- Backwash Valve Replacement Project-Signed Plan Set | 19.9 MB | |||
| D23008 Addendum No. 1 watermarked | 662.8 KB |

